12th April 2001 - Preparing the footing.

The Foundation Footings

The foundation footings were carefully prepared using a two-level square design, consisting of a large lower section and a smaller square section above it. Each footing was designed to withstand a load of more than 22 tonnes, providing the strength and stability required to support the substantial two-storey building.

The Development of the MISOLIMA Main Building

Construction of the MISOLIMA main building commenced in 2001 and continued over several years. The extended construction period was primarily due to FIKO Software Co., Ltd.'s commitment to developing the project entirely through its own financial resources, without relying on external loans or borrowings.

The company successfully financed the construction of two buildings using revenue generated through its own research and development (R&D) activities in software engineering and embedded systems. This approach reflects FIKO Software's long-standing philosophy of self-financed development, technological innovation and sustainable growth.